Project Requirements:

Design piping system to off load bulk tanker truck to CO2 storage vessels.  Connect storage vessels to plant process.

Liquid CO2 is delivered via tanker truck.  This system allows hoses to be connected to tank truck and convey liquid to two storage tanks.  Control valves, safety relief valves, and level control system are all part of this system.  Control system allows for feed of liquid Co2 to existing process.

Liquid Co2 is kept at high pressure, and exists at subzero temperatures.  The valving and control system is designed with personal protection and heat conservation insulation.  The whole system is designed as two separate parallel systems, with cross over to cross feed the systems if needed.  The control valve piping section was shop built on rail pipe support for easy installation and minimize field piping construction.

System was designed using Autodesk Inventor with Pipe Routing.